FEATURESMODULESBook a DemoASI ENGINEERING
Field inspector on a lift photographing a solar canopy with a mobile phone
Software add-ons

Add only the modules your team needs

Every module plugs into your base subscription and works the same in the office and in the field, on desktop, tablet and mobile.

6 modules · 1 coming soon

Choose a module

01
Work Orders
Create, assign and track maintenance tasks connected to your assets.
Learn more →
02
Inspections
Complete field inspections with customizable forms.
Learn more →
03
Roadway Asset Condition Management
Understand the condition of your road network and plan what to fix first.
Learn more →
04
Safety & Compliance Management
Keep inspections, safety checks and corrective actions organized.
Learn more →
05
AI Meeting Intelligence
Turn meetings into clear summaries so important follow-ups stay visible.
Learn more →
06
Digital Building Twin
Extend your ASI Software workspace with a digital twin of your buildings.
Learn more →
07 Coming soon
Climate Adaptation Planner
Helping communities prepare their infrastructure for a changing climate.
Learn more →
Desktop + mobile

Plan at your desk. Work in the field.

Every module runs on the same secure, cloud-based platform. Build plans and reports on a desktop browser, then complete inspections, work orders and updates on a phone or tablet. Your data stays in sync.

App StoreGoogle Play
ASI Software dashboard shown on a laptop, tablet and phone
Desktop · Tablet · Mobile
On desktop

Capital planning, reporting and asset management plans on a full screen.

On mobile

Field inspections, photos, work orders and updates on site.

One platform

Secure cloud access, unlimited users and unlimited storage.

Module 01

Work Orders

Create, assign and track maintenance tasks connected to your assets.

  • Tasks linked directly to assets
  • Priorities, photos and field updates
  • Track work from assignment to completion
Available on desktop · tablet · mobile
ASI SOFTWARE/Field OperationsSearch work orders, assets, tags...+ New Work OrderWork OrdersCreate, assign and track maintenance tasks connected to your assets.42 ACTIVEExport CSVOPEN ORDERS37DUE THIS WEEK37HIGH PRIORITY19COMPLETED5All Maintenance Tasks1–25 OF 42MH-4 MaintenanceSEP 8 • OVERDUEWO-2026-00001Asset:MH-4(Manhole)Location: Willow St / 13th Ave •UnassignedClean Hydrant FlushAUG 20 • OVERDUEWO-2026-00001Asset:HYD-15(Hydrant)Distribution Flow Line Check •UnassignedMain Valve Pressure TestAUG 28 • OVERDUEWO-2026-00001Asset:WV-7(Water Valves)CRITICAL PRIORITY • Isolation DefectGeorgia Hotel - Elevator InspectionAUG 27 • OVERDUEWO-2026-00001Asset:Georgia Street Hotel(Building)High Priority • Vertical Transit SafetyBRD - 3 - Bridge InspectionCOMPLETEDWO-00026Asset:BRD-3(Bridge Structure)Assigned: Darren Wiebe • Signed OffWO-2026-00001MEDIUM PRIORITYMH-4 MaintenanceManhole Chamber Silt & Ring DefectASSETMH-4ManholeLOCATIONWillow St / 13th Ave49.2596, -123.1219DUE DATESep 8, 2026OverdueASSIGNEDUnassignedReq: Kevin BrandinoDocuments:No File Cabinet attachments for assetACTIVITY TIMELINE (1–5 OF 6)Oct 14 • Title updatedRecentAug 26 • Assignee updatedAssigned to UnassignedAug 25 • Assignee updatedAssigned to Enrico Manalang, Kevin BrandinoAssign Crew & Re-dispatch"CONFIDENCE IN MANAGING YOUR INFRASTRUCTURE"Rows per page:25• Page 1 of 2
Module 02

Inspections

Complete field inspections with customizable forms.

  • Customizable inspection forms
  • Condition ratings and deficiencies
  • Follow-up actions
Available on desktop · tablet · mobile
ASI SOFTWARE/Field InspectionsSearch inspection templates, assets...+ New TemplateInspection FormsAssign standardized condition assessment forms to municipal infrastructure assets.3 TEMPLATESAvailable TemplatesActive (1)Municipal InfrastructureInspection2 SECTIONS✓ Selected for assignmentRoad InspectionForm2 SECTIONSPCI & Surface Rutting DefectStreetlight PoleInspection Form3 SECTIONSStructural Base & ElectricalNeed a Custom Schema?Create condition assessments withcustom PoF/CoF defect ratings,geotagged photos, and drop-downs.Build FormAssign to AssetExisting AssetNew AssetAUTO-FILLED24 Street NW osm-159579642...Retaining Walls • Concrete Gravity24 Street NW osm-159579642 (Retaining Walls · 1155 Vernon Dr, Vancouver, BC)Retaining Walls — Primary Structural BarrierSelected2ST-ADV-001 (Casework)Casework — Architectural Millwork Component2ST-UNC-001 (1155 Vernon Dr, Vancouver, BC)Linear Right-of-Way Retaining Segment2ST-UNC-002 (1155 Vernon Dr, Vancouver, BC)Sub-surface Drainage & CatchmentAsset DetailsSubmission MetadataLOCATION 1Vernon Drive Corridor — Zone 4BUILDING / STRUCTURERetaining Wall #12 — North WingLOCATION 3 (SUB-SEGMENT)Joint 04 + Parapet Cap (West)Submit InspectionSave as Draft"CONFIDENCE IN MANAGING YOUR INFRASTRUCTURE"Inspection Engine • AmSI Protocol
Module 03

Roadway Asset Condition Management

Understand the condition of your road network and plan what to fix first.

  • Road network condition overview
  • Defect tracking
  • Repair prioritization that supports capital planning
Available on desktop · tablet · mobile
ASI SOFTWARE/Roadways & PavementsSearch road segment, corridor, PCI...+ Log AI Survey RunRoadway Asset ConditionAI-driven automated PCI distress analysis, road damage detection, and capital resurfacing planning.AmSI LEVEL 3 AIExport GIS LayerNETWORK AVG PCI72/ 100CRITICAL DEFECTS14SegmentsAI SURVEY COVERAGE428 km(84%)5-YR RENEWAL BACKLOG$3.8M-18% TCOLinear Roadway Corridors64 OF 182 KMAROD-40 • Broadway CorridorPCI 54 • FAIRAROD-40Arterial 4-Lane •1.45 km(HMA Surface)Detections: 8 • D20 Alligator & D00 Longitudinal •Action: 2027AROD-17 • Arterial Corridor S-14PCI 82 • GOODAROD-17Primary Truck Route •3.20 kmSurveyed Sep 2026 • Minor raveling only •Routine Seal 202924 Street NW • Collector Sector 08PCI 38 • POORROD-024Sub-base Flex Defect •0.85 kmCRITICAL PRIORITY: Severe Alligator Fatigue • Mill & Overlay Req.Ring Road • East Overpass ApproachPCI 66 • FAIRHWY-101High-Speed Express •2.10 kmJoint expansion faulting • Recommended Crack Seal & Diamond GrindAlbert Street • South Commercial ZonePCI 92 • EXCELAROD-02Commercial Arterial •1.80 kmResurfaced Summer 2025 • High Friction Coefficient (0.78)AROD-40PCI 54 (FAIR STATE)Broadway Corridor EastGPS: 50.443441, -104.527606 • Chainage 0+000 to 1+450ROI: 2.0–22.0mROAD DAMAGE DETECTIONFrame 14/794 (2%)CAMERA & ROITilt: -3.0°H: 1.2mNear: 2.0m | Far: 22mGPS LOCATIONLat: 50.443441Lon: -104.527606DETECTIONS: 8D00 Long. Crack: 1D10 Trans. Crack: 5D20 Allig. Crack: 1D40 Pothole: 1D20 Alligator_Crack 40%D00 Longitudinal_Crack 59%D10 Transverse_Crack 48%D00 Longitudinal_Crack 22%D10 Transverse_Crack 38%AI CRACK CLASSIFICATIOND20 High Alligator40% Confidence • FatigueRIDE QUALITY (IRI)2.18 m/kmModerate RoughnessAVG RUT DEPTH12.4 mmHydroplaning AlertOPTIMAL TREATMENTMicro-SurfacingTarget Season: 2027AmSI 5-YEAR RENEWAL FORECASTTreat 2027 (Micro-surface):$142,000Mitigates sub-base moisture infiltration • +12 Yrs ExtendedDelay to 2029 (Full Reconstruction):$485,0003.4x Cost Spike if Alligator fatigue penetrates aggregateCreate Resurfacing Work Order"CONFIDENCE IN MANAGING YOUR INFRASTRUCTURE"AmSI AI Pavement Module • P.Eng & CFA Defensible
Module 04

Safety & Compliance Management

Keep inspections, safety checks and corrective actions organized.

  • Inspections and safety checks
  • Corrective actions
  • Organized compliance records
Available on desktop · tablet · mobile
ASI SoftwareKBSafety & ComplianceKeep inspections, safety checks and corrective actions organized.AUDIT-READY (OHS)98.4%COMPLIANCE RATE18SCHEDULED CHECKS4OPEN CAPA142ORGANIZED RECORDSSearch inspections, checks, CAPA, assets...All statusesAll prioritiesAll assigneesExportINSPECTION / CHECK ▾ASSET ▾STATUS ▾PRIORITY ▾DUE ▾Confined Space Gas CheckSAF-2026-088MH-4ManholeUnassignedMediumSep 8OverduePre-Trip Fleet Safety CheckSAF-2026-087TRK-14Public Works FleetCompletedLowAug 26ArchivedHydrant Flow & Backflow ValveSAF-2026-081HYD-15Hydrant AssemblyUnassignedMediumAug 20OverdueLockout/Tagout Pressure TestSAF-2026-080WV-7Water ValvesUnassignedCriticalAug 28OverdueElevator Hoist Cable AuditSAF-2026-074BLD-14Georgia FacilityUnassignedMediumAug 27OverdueFall Arrest Harness RiggingSAF-2026-027WPOL-6Poles / AerialUnassignedHighAug 12OverdueBridge Scaffold & Anchor BoltsSAF-2026-026BRD-3Bridge StructureCompletedMediumJul 28AuditedRows per page:25 ▾1–25 of 42WO-2026-00001MH-4 MaintenanceUnassigned ▾MediumASSETMH-4ManholeLOCATIONWillow St / 13th...49.2596, -123.1219ASSIGNEDUnassignedRequested by Kevin ...DUE DATESep 8Overdue≡DocumentsNo File Cabinet documents for this asset.Activity Timeline1-5 of 6Oct 14Title updatedTitle changedOct 14Title updatedTitle changedAug 26Assignee updatedAssigned to UnassignedAug 25Assignee updatedAssigned to Enrico ManalangAug 25Assignee updatedAssigned to Enrico Manalang, Kevin BrandinoPrevPage 1 of 2Next
Module 05

AI Meeting Intelligence

Turn meetings into clear summaries so important follow-ups stay visible.

  • Meeting summaries
  • Decisions captured
  • Action items tracked
Available on desktop · tablet · mobile
ASI SoftwareMTAI Meeting IntelligenceTurn meetings into clear summaries so important follow-ups stay visible.AVAILABLE ON DESKTOP · TABLET · MOBILE38MEETING SUMMARIES14DECISIONS CAPTURED9ACTIONS TRACKED100%FOLLOW-UPS SYNCEDSearch meeting summaries, decisions, action items...All meeting typesAll decisionsAll action leadsExportMEETING TITLE / ID ▾LINKED ASSET ▾SUMMARY ▾DECISIONS ▾FOLLOW-UP ▾Q4 Capital Renewal ReviewMTG-2026-104 • 48 minAROD-40Broadway East CorridorSummarized3 DecisionsOct 222 Actions OpenMH-4 Silt Cleanout & OHS DebriefMTG-2026-103 • 24 minMH-4Manhole Vault (Willow St)Summarized2 DecisionsOct 14All CompleteAI Road Damage Survey ReviewMTG-2026-101 • 35 minAROD-17Arterial Corridor NetworkSummarized4 DecisionsOct 193 Actions OpenWater Main Pressure & LOTO ReviewMTG-2026-098 • 52 minWV-7Booster Valve StationSummarizedCritical CAPAOct 16Immediate DueCouncil Budget & Defensibility PrepMTG-2026-095 • 60 minFIN-PQSP.Eng, CFA & PQS ModelSummarized2 DecisionsOct 11AdoptedBridge Rigging Safety Toolbox TalkMTG-2026-092 • 15 minBRD-3Ring Road Overpass Set BSummarized1 DecisionOct 08CompleteRows per page:25 ▾1–25 of 38MTG-2026-104Q4 Capital Renewal ReviewAI Transcribed ▾3 Decisions LockedPROJECT SCOPEAROD-40 CorridorBroadway ResurfacingRECORDING48m 12s AudioTranscript 99.4% AccSESSION LEADMarcus ThorneDirector of InfrastructureCOUNCIL DATEOct 22, 2026Due in 8 Days✦ AI EXECUTIVE SUMMARYAuto-GeneratedCouncil approved $142k proactive micro-surfacing for AROD-40 toprevent a 3.4x ($485k) full reconstruction spike by 2029.Confirmed P.Eng & CFA model will be attached to formal council packet.Decisions Captured & Action Follow-ups3 of 3 ActiveDECISION #1Allocate $142,000 from 2027 Pavement FundAssigned to:Finance & CAO• Approved by CouncilACTION ITEM #1Submit P.Eng Defensibility Report by Oct 18Action Lead:Devon Vance• In Progress (80%)ACTION ITEM #2Schedule MH-4 Follow-Up Bump Test with Crew BravoAction Lead:Nadia Al-Mansoor• Linked to WO-00086Sync Actions to Work Orders
Module 06

Digital Building Twin

Extend your ASI Software workspace with a digital twin of your buildings.

  • Digital twin of your buildings
  • Lives in your ASI Software workspace
Available on desktop · tablet · mobile
ASI Software Digital Building Twin dashboard showing an isometric 3D office floor with live readings for space utilization, energy, air quality and occupancy
Module 07 Coming soon

Climate Adaptation Planner

The roads, bridges and buildings we look after today will carry our communities through the decades ahead, into a climate that is already changing. The Climate Adaptation Planner is being built to help you prepare for that future with care: to protect the places people call home, and to leave a stronger, safer and more resilient world for the generations who will inherit what we build.

Start with the base, add as you grow

Modules are added to the base subscription. See what's included.

Start free trialBook a demo
ASI Software multi-device interface

FAQ

Frequently Asked Questions

Quick answers to common questions about our free trial, user limits, data uploading, and platform access.

Is there a free trial?
⌄

Yes! Every new account includes a 14-day free trial, giving you full access to explore ASI Software before choosing a subscription.

What happens after my free trial ends?
⌄

At the end of your trial, you can choose the subscription plan that best fits your organization. If you decide not to subscribe, your account will simply become inactive.

How many users and storage are included?
⌄

Every subscription includes unlimited users and unlimited cloud storage. The only limit is the number of assets you manage in the platform. If you need additional capacity, you can add 500 more assets for just $50.

Who will input our assets into ASI Software?
⌄

You can easily add and manage your assets yourself using ASI Software. If you'd prefer, the ASI Engineering team can also handle the entire asset inventory process for you—including on-site asset collection, condition assessments, and importing your data into the system.

Where can I access ASI Software?
⌄

ASI Software is cloud-based, so you can securely access it from anywhere using a computer, tablet, or mobile device. As long as you have a stable internet or mobile data connection, you can upload, download, and manage your asset information wherever you are.

Book a Demo
Confidence in Managing Your Infrastructure
© 2026 ASI Software Inc. (ASI Software). All rights reserved. Proudly serving our clients across Canada.
Darren Chatbot
Darren - Your Asset Management Expert Darren - Your AM Expert